 |
 |
|
 |
 |
|
Working through the pictures from top
left: The first picture is looking back from the bow. The
second picture was Matt issuing instructions, what you don't see
in this picture is Alastair looking more than perplexed while
trying to see what Matt was doing. Third picture was Peter
taking charge. Fourth picture of one of the ribs. |
|
|
 |
 |
 |
|
|
Above a side shot of HMS Kent, you can
see some of the scaffolding coming down, a niece forward shot
and finally the group shot on the hanger deck at the rear of the
ship.
(28th February 2009) |
 |
 |
|
 |
 |
|
The photographs above and directly
below were taken at the last Construction Progress Meeting on
the 16th of March. The first two are of the
forward bridge section that John Adams has been working on, the
next two show the mid section and hanger section, don't worry
Peter Clayton has assured me the purple will go on the hanger
door. |
 |
|
 |
 |
 |
|
The first picture above shows some of
the on the mid section of the rib and machine gun, the remaining
three pictures show the superstructure on the hull.
(16th March 2009) |
 |
|
 |
|
 |
|
Peter Clayton and Dave Shirley got
together this weekend to paint the deck, a couple more coats to
go. The last picture show the forward gun turret with the
top hand rails made, although not in the picture the shell eject
aperture has also been completed.
(22nd March 2009) |
|
|
Model Boats April'09 edition has a
full page feature on our project to build of HMS Kent |
 |
|
|
|
Not so many pictures this time,
hopefully we will be able to get some of the hull shortly.
Work has commenced on the wiring of the electrics within the
hull along with the bilge pumps. (5th April 2009) |
|
To the right some of the fittings for
the forward gun, the ladders and hand rail, the shell eject
funnel and parts for the encasement |
 |
To the right some of the graphics for
use on HMS Kent, I've used special adhesive paper through my ink
jet printer, then the images are cut out and coat of
polyurethane added. |
 |
|
|
|